Skip to content
Fault? Available day and night, anywhere in the Netherlands: Faults, 24/7: 043 204 18 26 NLENClosed now, open again tomorrow 08:30

Solar panel electrical connection in the Netherlands

I take care of the electrical side of your PV installation: changes to the consumer unit, connecting the inverter, cabling and registration with the grid operator. Solar panels on the roof I install through a regular partner. You have one point of contact for the whole process.

Only the electrical work, no panels needed? That is possible too.

Consumer unit check and changesInverter + AC cabling NEN 1010Smart meter and exportCoordination with the panel supplier

What I take care of and what my partner does

One quote, two specialists: everything is arranged for you without you having to coordinate.

My partner takes care of the solar panels on the roof, the mounting system, the DC cabling, installation by a certified roofing team and supplying the inverter.

  • On-site electrical survey (free with a quote)
  • Consumer unit check, with changes if needed
  • Connecting the inverter with AC cabling (NEN 1010)
  • Registration with the grid operator (export)
  • Coordination on smart meter and export
  • Handover with test report and certificate in your customer portal
  • Coordination with the partner for the panels

Who do I do the electrical connection for?

  • Homes: consumer unit changes and connecting the inverter
  • Export and smart meter arranged
  • Combining with an EV charger or connecting a battery
  • Business premises: consumer unit and inverter for commercial roofs, logistics, production or offices
  • Connection for energy management when charging your fleet
  • For property owners (letting)

Smart combinations with other installations

With an EV charger

Charge your car with surplus solar power. Smart EV chargers (Zaptec, easee) handle this automatically.

With a new consumer unit

Many old consumer units lack room for solar panels. I combine the changes and the installation in one go.

With a battery

Connecting a battery, on quotation. I connect it to the consumer unit and inverter, the supply goes through a partner.

With a smart meter

Energy management times your usage for the right moment and gets more out of your installation.

How does the electrical work go?

From first contact to handover in 5 steps.

  • Contact or quote request: call for a consumer unit check or fill in the form. I discuss your situation and the partner for the panels.
  • On-site electrical survey, free: consumer unit, location of the inverter and the position with the grid operator. Concrete advice on the spot.
  • Tailored quote within 3 working days, with a guide price. Transparent: electrical work and notifications to the grid operator.
  • Electrical connection: consumer unit, inverter and AC cabling. At the same time the partner installs the panels on the roof.
  • Handover: testing and test report in the portal. Export arranged with the grid operator.

Questions about solar panels

More in the knowledge base

Do I need a new consumer unit?

Often, yes. Many old consumer units lack room for the PV circuit and its protection. I check this at the site survey and give advice. Combining it with the installation is usually cheaper than doing it separately.

Am I always allowed to export to the grid?

For a single-family home: usually yes, provided your main connection is big enough. For large installations (10+ panels) notifying the grid operator is mandatory. I arrange this notification.

What is an inverter and which brand?

An inverter converts DC power from the panels to AC for your home. I install SMA, Solis, Huawei and GoodWe, depending on the situation. A monitoring app comes as standard.

How long does the installation take?

Standard installation: 1 day for panels and inverter. If the consumer unit needs changes: 1 to 2 days. The site survey beforehand sets the exact schedule.

Do I get a guarantee?

Yes. My installation comes with a 2-year guarantee. On top of that, the manufacturer's warranties on panels and inverter apply.

Can I combine it with an EV charger for my car?

Yes, highly recommended. A smart EV charger (Zaptec, easee) charges on surplus solar power. Request a combined quote for the best return.

Do I need a battery?

Not required, but worth considering now that net metering is going. A battery shifts the surplus to the evening. The payback time of a battery varies. I give tailored advice.

What if my roof needs strengthening or replacing?

I establish that beforehand at the site survey. I do not do roofing work myself, but I work with reliable roofers. Sometimes it is cheaper to do the roof and the solar panels in one go.

Near you too

For planned jobs and faults I travel all over the Netherlands, day and night for a fault. I get to you fastest in Limburg; elsewhere you can see right here how long the drive takes.

  • Jobs and faults, 24/7: all of the Netherlands
  • Fastest on site: Limburg
AmsterdamRotterdamThe HagueUtrechtEindhovenGroningenZwolleNijmegenLeeuwardenMiddelburgBredaEnschedeAlmereUlestraten

Provincial borders: CBS and PDOK, CC BY 4.0

One request, two specialists

Liever eerst even overleggen? 043 204 18 26 Mon to Sat 08:30 to 17:00
Call Quote