Electrics when renovating
When the electrician needs to come, how many sockets per room, what is allowed in the bathroom and who does what: grid operator, energy supplier or installer.
10 articlesWritten by Kevin Hermans
Articles
Moving the meter cupboard: can it be done and what is involved
It can be moved, but the connection point belongs to the grid operator. That part sets the schedule and a large share of the cost.
Installing three-phase power: when do you need it
Three-phase power is needed as soon as an appliance demands more than a normal circuit can handle. The application to the grid operator is usually the longest part.
What electrical work can you do yourself during a renovation
You may do it yourself in your own home, but if there is damage the insurer looks at who did the work and whether it meets the standard.
Renovating and the meter cupboard: when should it be included
Replacing the consumer unit during the renovation is considerably cheaper than afterwards, because everything is open anyway.
Electrics in an extension
An extension is the moment to be generous with cable runs: everything you include now costs almost nothing, later it means another renovation.
Concealed or surface-mounted cabling: what works where
Concealed is neater, surface-mounted is quicker and cheaper. In a load-bearing wall or a listed building you do not always have a free choice.
Electrics in the bathroom: what is allowed where
The bathroom is divided into zones. For each zone the standard sets what may be installed and how well it must be protected.
Electrics in a new kitchen: which circuits and where
A modern kitchen easily has four to six circuits. Induction almost always needs its own power circuit.
When should the electrician come during a renovation
Two moments: when the walls are open, and when they are closed and finished. Miss the first moment and you will be chasing walls again later.
What does an electrician cost in 2026? Hourly rate and call-out charge explained
Hourly rate, call-out charge, material margin and VAT, without beating about the bush. Including what I charge myself and why a fixed call-out charge is fairer.
Other topics
Choose a topic. Every article starts with a short answer.
Consumer unit and meter cupboard
How many circuits you need, when your consumer unit really has to be replaced and what is actually printed on all those…
12 itemsEV chargers
Charging at home: single-phase or three-phase, which protection goes with it, load balancing and what makes an EV charger in an owners' association (VvE) diffe…
9 itemsSolar panels and home batteries
What panels and a battery do to your meter cupboard, why your inverter cuts out when the grid voltage is too high, and what…
11 itemsFixing faults
RCD tripped, a room without power, flickering lights. Explained step by step, including what you are allowed to do yourse…
10 itemsSafety and standards
NEN 1010 and NEN 3140 in plain language, which RCD you need, smoke alarms and what an insurer actually…
9 itemsIntercom and access
Choosing a video intercom for a house or flat, and whether it can run over your existing doorbell wiring.
8 itemsLighting and switching
Dimming, LED, outdoor lighting and smart switching, with the pitfalls I come across in practice.
8 itemsNetwork and wifi at home
Cabling, wifi that does not reach everywhere, and what you can put in for next to nothing during a renovation.
8 items